With average regular season attendance this year likely to hit the 28,000 mark, how long do you think it will take before BMO Field engages in another round of capacity expansion (the stadium was designed with easy expansion in mind)? We will likely get some games for the 2026 World Cup, which seems to be a shoe-in for Canada-USA-Mexico's joint bid, so what capacity do you think we'll need (since the baseball-specific Rogers Centre is no longer an option). My expectation is 40,000 permanent seats by 2026, with construction possibly to begin in another 3 years. With the potential of a much larger TV contract in 2022, we need to prepare the good ship TFC for MLS 4.0...