Ya, new scoreboards (Hi Def) and new light boards on the new stand.
New sound system coming with the roof.
Road Trips: July 7 2007 Chicago, July 22nd 2007 Columbus, August 11 2007 NY, October 13 2007 LA, March 29 2008 Columbus, May 24th 2008 DC, May 26 2008 Montreal, June 28th 2008 NE, March 7-11-14 2009 Charleston, March 28 2009 Columbus, April 10 2010 New England, May 12 2010 Montreal, April 7 2012 Montreal, March 16 2013 Montreal , June 3 2014 Montreal, March 14 2015 Columbus
Twitter: @RPBPhil
this cold must be delaying construction somewhat
The tunnel bottleneck are the stairs on the north side. However they are currently in the process of extending the tunnel to a new set of stairs north of a new 5th track. So those exiting to the train platform will go a different way than those going to Atlantic. This should effectively increase the capacity of the underpass.
Still, I'm glad I'm catching the Lakeshore East train.
Hey look at that, a whole page so far with no pictures and only comments. I knew this concept was too good to be true.
Disclaimer: Yes I realize it's somewhat hypocritical of me to add another post without pictures regardless of the post content. Shut up.
Most of the work being done is being done out of sight. What you're seeing when you drive by on the gardiner is just the tip of the iceberg.
The tunnel club (where the players come out) and the locker room area is completely unrecognizable. Although they still have a lot of work to do and they are slightly behind, they have a contingency plan because they have to be done by May 1st. No other option.
I wish they had a web cam set up so I can watch the paint dry.
I'm certain that they are working 18 or 24 hour days.
I'll drive by at 6am and staff is working.
and they'll have the lights on at night until quite late.
like 11pm.
i'm sure the cold has slowed them down.
but it hasn't stopped them.
I live right downtown and am out the door by 6:45/7am, and pass quite a few of the construction projects going on in the core on my way to work, and they're already working on them at that time of the morning (yes, even the mornings from the past few weeks where it's been almost -30 with the wind chill).
If they can start work at 7am on downtown condos, they can work on BMO. Working outdoors is working outdoors, no matter what you're doing.
^Amazing picture thank you for that and to everybody else who has contributed pictures to this thread!
awesome picture GabrielHurl....
I drove past this weekend, interesting that it appears the structure for the new stands is modular concrete design instead of aluminum. Wonder why the change in design?
went for a jog tonight.
took some snaps.
some interesting things.
how the wrap around concourse connecting West, South, East is shapping up.
it looks good.
there appears to be an elevator being installed at Gate 4. From the Ground directly to the press box.
there appears to be a new gate between 3b and 4. Supporter's Gate??